I have created a first draft of the piece.
https://www.youtube.com/embed/0EpZomIZ4mE
It must be watched in 720p 60fps to see the whole process and editing correctly.
A lot of things have changed in this draft from the plan and story board.
I began the process with the information that my actor would no longer be able to help me out as they were no longer available. This was quite a blow to production as it had almost solely relied on this actor being available. So with little time left I decided the next best actor was myself and so set about reviewing my story board to incorporate this as a factor. This meant I had to scrap all the work in my post entitled construction 5 as the sequence would not make sense with a different actor. This led me to scrapping the entire first part of the sequence, but still wanting to use some of the work i had done i incorporated some of the paper cut outs into this draft.
I then planned to film the last 2 sequence parts and complete the first draft but bad weather and lack of transport struck so the last part of the sequence had to be reworked into the background that you see in this draft. I decided that what i wanted out of the last part was intricacy and movement so i created these themes on a much smaller scale with food colouring and a tub of water.
the second part of the sequence was changed slightly as whilst filming I saw that the look i wanted wasn't going to come through if i stuck to the plan. I decided to change the props and distances from the camera to create more depth to the draft.